The project in three phases
Two phases open before the building exists.
A cultural bridge between Málaga and Round Rock that opens in 2026, grows in 2027 and culminates in a building of its own.
Space secured
A signed agreement with the City of Round Rock.
The project isn't looking for a home: it already has one. The agreement with the City of Round Rock secures the venue from day one.
- ✓Year 1 (2026): the Downtown Round Rock Art Gallery.
- ✓Years 2 to 7: the full space, in Rooms 111 and 112 of the Griffith Building, the former Round Rock library.
Overview
Two phases build the audience and the case. The third is what that case pays for.
November 2026
Birthing Picasso
An immersive gallery. Picasso's birthplace facade, rebuilt at full scale.
Art Gallery · Downtown Round Rock
October 2027
Unlocking Picasso · El laberinto
452 sq m. Eleven rooms. One route, no way back.
Griffith Building · Rooms 111-112
To be built
White Stone Center
And then, the building.
Permanent venue · Round Rock
Phase 01 · November 2026
Birthing Picasso
Art Gallery · Downtown Round Rock
An immersive gallery. Picasso's birthplace facade, rebuilt at full scale.
A structure is inserted into an existing room: the birthplace facade rebuilt at full scale, with projection, Dolby 5.1 surround sound and a control room. The project does not rebuild the gallery; it inserts a piece and leaves the room intact.
- →The full-scale facade is the screen
- →Projection and Dolby 5.1 surround sound
- →Built from panels: assembled and dismantled
- →Opens November 2026
Online: birthingpicasso.com


Phase 02 · October 2027
Unlocking Picasso · El laberinto
Griffith Building · Rooms 111-112
452 sq m. Eleven rooms. One route, no way back.
A labyrinth with its own entrance, its own hours and its own shop, opening alongside phase 1. Curved partitions inside a rectangular shell: each room is one colour and one sentence. The visitor walks a life, not a floor plan.
- →11 rooms in a one-way sequence
- →Each room, a colour and an idea: Birth, Rose, Blue, Guernica…
- →A colour corridor with the works hung
- →Its own entrance, hours and shop
Online: unlockingpicasso.com







Phase 03 · To be built
White Stone Center
Permanent venue · Round Rock
And then, the building.
A permanent venue of roughly 33,600 sq ft: galleries, two auditoriums, workshops and a shop. It is financed during the phase 2 operating period, over the next five years, and has its own architectural document.
- →~33,600 sq ft, permanent
- →Galleries, two auditoriums, workshops and a shop
- →Financed over the 5 operating years of phase 2
- →Its own architectural document, already issued

Founding circle
The space is secured. What's missing is phases 1 and 2.
Both phases are designed and the venue is signed with the City of Round Rock. What's missing is the financial support to open in 2026 and 2027. Phase 3 will be funded over the next five years. Become a founder of the project.